Julius Blum GmbH, Werk 7, Dornbirn

New large-scale refrigeration control centre - machine and compressor cooling as well as air-conditioned production hall with 15,000 m2.

The goal:

  • New construction of a refrigeration control centre
  • Cooling supply for air conditioning of the production hall
  • Cooling supply for machine and compressor cooling

Our solution:

  • Use of 4 water chillers with a cooling capacity of 4.2 MW
  • Refrigeration circuits +6°/+12° for supplying the air conditioning system as a closed system
  • Use of 5 cooling towers with a cooling capacity of 9.75 MW
  • Refrigeration circuits +6°/+12° for supplying the air conditioning system as a closed system
  • Machine and compressor cooling as an open system
  • 1 cold buffer tank with 10 m³
  • 1 cooling water treatment for water softening
  • 1 cooling distribution network made of stainless steel pipes with 3,000 m length

Your contact person

Gerfried Kreuzberger

Gerfried Kreuzberger

Head of Project Management

E-Mail: g.kreuzberger@intemann.at Tel.: +43 (0)5574 85444-27 vCard

Your contact person

Hubert Rädler

Hubert Rädler

Managing Director & Head of Sales

E-Mail: h.raedler@intemann.at Tel.: +43 (0)5574 85444-62 vCard


Cooling Distribution 6°/12° C
Supply Pumps for Cooling
Pressure Maintenance
Supply Lines in a Production Hall